Lines on a road

Road Safety Improvements – Chapel Road, Keysborough

Project Summary

Start date: Thursday 8 October

Funding: Greater Dandenong Council has received $625,900 (GST inclusive).

Project overview

Council has secured funding through the State Government Safer Local Roads and Streets Program. The funding will be used to deliver road safety improvements to encourage safer driver speeds and help reduce the risk of people being injured on Chapel Road.

Why is this happening?

Between February 2018 and December 2024, there were 10 crashes along this section of Chapel Road, resulting in 21 injuries, including vulnerable road users such as cyclists and motorcyclists.

Traffic surveys show that many drivers exceed the 60 km/h speed limit, increasing the risk and severity of crashes. To improve safety, Council has secured funding through the State Government Safer Local Roads and Streets Program.

The funding will be used to deliver road safety improvements to encourage safer driver speeds and help reduce the risk of people being injured on Chapel Road.

What we are proposing

The proposed works include:

  • Lowering the speed limit from 60 km/h to 50 km/h and a flashing 40 km/h sign
  • Raising the existing signalised intersection at Homeleigh Road and Chapel Road
  • Adding a raised pedestrian crossing (also known as a wombat crossing) at Tyers Lane to make it safer and easier to cross the road
  • Adding raised platforms outside Sirius College and No. 107 Chapel Road to reduce driver speed

Consultation

The consultation has now closed. 

Residents and local businesses were invited to share their feedback on the initial designs through the ‘Have Your Say’ consultation and a letterbox drop between 8 October to 2 November 2026.

Thank you for having your say. We heard strong support for making Chapel Road safer for people walking, crossing the road and accessing local schools. We also received valuable feedback about traffic impacts and speed management. We're now reviewing all feedback to help finalise the design. Your input will play an important role in shaping the project, and we'll share further updates in the below link as we progress.

Next steps

Council is currently reviewing feedback received during the consultation period from 8 October to 2 November 2026 and incorporating it into the revised design.

How to contact us

For questions or further information email RoadSafety@cgd.vic.gov.au or phone our transport team on 03 8571 1000.

  • Chapel Road Plans
    Chapel Road Plans
  • Chapel Road Plans
    Chapel Road Plans
  • Chapel Road Plans
    Chapel Road Plans
  • Chapel Road Plans
    Chapel Road Plans
  • Chapel Road Plans
    Chapel Road Plans
Off

Frequently Asked Questions

How are the type and locations of treatments chosen?

The proposed treatments and locations were identified through road safety and traffic assessments to maximise safety benefits, with consideration given to traffic conditions, road user movements and community feedback. Their placement has also been influenced by existing infrastructure and site constraints, including drainage, street lighting, utilities and property access requirements. The treatments are supported by road safety experts through the grant funding application process.
 

Will the proposed speed reduction and raised safety platforms increase travel times?

The proposed speed reduction and raised safety platforms are intended to improve safety by reducing vehicle speeds and increasing driver awareness at key locations along Chapel Road. While some motorists may experience a minor increase in travel time, the overall impact is expected to be small.

For example, travelling 1.66 km at 60 km/h takes approximately 1 minute and 40 seconds, while travelling the same distance at 50 km/h takes approximately 2 minutes. This equates to an increase of around 20 seconds across the entire section of road.

Research consistently shows that lower vehicle speeds reduce both the likelihood and severity of crashes. The safety benefits for people walking, riding bikes, accessing public transport and entering or exiting properties are expected to outweigh the minor increase in travel time. Traffic assessments indicate Chapel Road will continue to operate satisfactorily following implementation of the proposed treatments.

Why not rely on speed cameras or increased enforcement instead?

Several respondents suggested greater use of police enforcement, speed cameras and red-light cameras. While enforcement plays an important role in road safety, infrastructure improvements can provide continuous safety benefits and encourage safer driving behaviour regardless of enforcement levels.
 

Why is the speed limit being reduced?

The proposed speed limit reduction is intended to improve safety for all road users by reducing the likelihood and severity of crashes. In accordance with relevant Victorian speed zoning guidelines, the function and characteristics of Chapel Road are considered more consistent with a 50 km/h environment, particularly given the presence of residential properties, public transport, pedestrian activity and the proposed road safety improvements.

Will property and driveway access be maintained?

Yes. Existing property access will be maintained. Council has reviewed driveway access arrangements as part of the design process and will continue to consider specific concerns raised through the consultation.
 

Why are there no proposed changes to Church Road/Chapel Road and Westwood Boulevard/Chapel Road roundabout?

We acknowledge that members of the community have raised concerns regarding pedestrian safety at both the Church Road/Chapel Road and Westwood Boulevard/Chapel Road roundabouts. While potential improvements at these locations were considered, site-specific treatments could not be accommodated within the scope of the current project due to available funding constraints.

We are continuing to investigate opportunities to improve safety at these locations and is seeking additional funding through programs such as the Safer Local Roads and Streets Program to help deliver further improvements in the future.

Although no specific upgrades are currently proposed at these roundabouts, the project's broader corridor treatments, including the reduced speed limit and traffic calming measures, are expected to lower vehicle speeds on approach to the roundabouts, which will improve safety for pedestrians crossing near these locations.

Why aren’t more pedestrian crossings included?

The locations included in the project were selected based on road safety assessments, pedestrian demand, available space, existing road conditions and available funding.

We acknowledge requests for additional crossings at locations including Sirius College and various roundabouts and will consider these locations as part of future funding opportunities and road safety programs.

When will construction occur?

Construction timing has not yet been confirmed. Once the design is finalised, affected residents and road users will be advised of the proposed construction program and any temporary traffic management arrangements.