Council will be constructing a footpath along the south side of Fowler Road in Dandenong South, between South Gippsland Highway and the Eumemmerring Creek Bridge.
Once complete this footpath will provide a pedestrian connection from South Gippsland Highway to Nathan Road.
This footpath is funded by the Level Crossing Removal Project as part of the Progress Street Level Crossing Removal.
Download the Consultation Plans - 6.3MB
Construction is anticipated to commence in late October/early November and be completed by the end of 2025.
This project is fully funded by the Level Crossing Removal Project as part of the Progress Street Level Crossing Removal.
You can find information on the Progress Street Level Crossing Removal Project at the Victoria’s Big Build website: Progress Street, Dandenong South - Victoria’s Big Build.
Pedestrian access will be maintained throughout the works as part of the traffic management requirements. Pedestrian will need to follow signage and traffic controller directions to move around the current section of works.
The temporary footpath will be removed in sections as construction progresses along Fowler Road.
No. The footpath has been designed to be used by pedestrians only.
Australia Post bikes and EDVs may use this path as they have an exemption within the Road Rules allowing them to use a footpath.
Yes. Australia Post bikes and EDVs may use this path as they have an exemption within the Road Rules allowing them to use a footpath.
The path has a wider design than a standard path to accommodate these bikes and EDVs if required.
Changes to the design may be made during construction based on contractor and community feedback.
A number of properties will have their driveway access impacted during these works. The contractor will contact any impacted properties to discuss the changes and work with them to minimise the impacts.
Council’s Transport Team can be contacted to discuss the construction of this footpath via telephone on 8571 1000 or email RoadSafety@cgd.vic.gov.au.
Any questions related to the Progress Street Level Crossing Removal Project should be directed to the Level Crossing Removal Project.
The Level Crossing Removal Project can be contacted via telephone on 1800 105 105 or online via Victoria’s Big Build website under Contact Us.